Academic Journals Database
Disseminating quality controlled scientific knowledge

A Case Study on Curve Design for Improvements to Existing Master Plan Roads

ADD TO MY LIST
 
Author(s): P.Sreenu | Appa Rao G, | SSSV Gopala Raju

Journal: International Journal of Engineering and Advanced Technology
ISSN 2249-8958

Volume: 2;
Issue: 5;
Start page: 238;
Date: 2013;
VIEW PDF   PDF DOWNLOAD PDF   Download PDF Original page

Keywords: About four key words or phrases in alphabetical order | separated by commas.

ABSTRACT
The present case study deals with development ofexisting roads to master plan roads. The roads from NH-5junction to kommadi village, NH-5 to Navodhaya School, arelocated in Visakhapatnam city in India. Particularly these areasare densely populated and occupied with housing units, schoolsand commercial buildings. As these roads could not meet thepresent & and future demand, new road proposals was putforward by Visakhapatnam development authority (VUDA) towiden the existing road to master plan road. The present conditionof the road is in deteriorated state which is sacrificed and newpavement design is proposed according to IRC-37:2001recommendations. The studies involves collection of details suchas road width, gradient, deflection angle, length of curve andradius of curve and design them to the prescribed standards ofIRC code. The curve parameters have been measured usingtheodolite by traversing along center line of the curve.
Why do you need a reservation system?      Save time & money - Smart Internet Solutions