Expected Delays in Completing Projects under Uncertainty

ADD TO MY LIST
 
Author(s): Ahmed Farouk Abdul Moneim

Journal: Jordan Journal of Mechanical and Industrial Engineering
ISSN 1995-6665

Volume: 2;
Issue: 1;
Start page: 65;
Date: 2008;
VIEW PDF   PDF DOWNLOAD PDF   Download PDF Original page

Keywords: Project Delay Period | Time-Over-Run | Standard Delay Function (SDF) | Nonlinear Minimization Problem | Consequences of

ABSTRACT
A method is proposed to estimate, rationally, a contingency covering probable delays in completing projects. Projectcompletion time is assumed random variable distributed normally with given expected value and variance. Two purestrategies and a mixed strategy for decreasing expected delay, if it turns out to be unacceptable, are presented. A new functionSDF(ZC), as a function of a standard normal variable ZC corresponding to contract time TC, is derived and given also in atable form for calculation simplicity. The mixed strategy of compressing both expected project completion time and itsvariance, to achieve a desirable level of expected project delay, leads to a nonlinear program and solved by Solver/Excel