Academic Journals Database
Disseminating quality controlled scientific knowledge

Australasian Journal of Construction Economics and Building

ISSN: 1835--6354


ADD TO MY LIST
 
Editorial

Author(s): Craig Langston | Rick Best
Volume: 9
Issue: 2
Year: 2012
An Assessment of the State of Maintenance of Public Hospital Buildings in Southwest Nigeria

Author(s): Olumide Adenuga | Abayomi Ibiyemi
Volume: 9
Issue: 2
Year: 2012
Project Culture in the Chinese Construction Industry: Perceptions of Contractors

Author(s): Jian Zou | George Zillante | Vaughan Coffey
Volume: 9
Issue: 2
Year: 2012
The Corporate Governance of Australian Listed Construction Companies

Author(s): Patrick Tait | Martin Loosemore
Volume: 9
Issue: 2
Year: 2012
Essence of Time in Construction Contracts

Author(s): Tony Lim
Volume: 9
Issue: 2
Year: 2012
Role of Leadership in Transforming the Profession of Quantity Surveying

Author(s): George Ofori | Shamas-ur-Rehman Toor
Volume: 9
Issue: 1
Year: 2012
Applying Conjoint Analysis to Study Attitudes of Thai Government Organisations

Author(s): Natee Suriyanon | Visuth Chovichien
Volume: 9
Issue: 1
Year: 2012
Editorial

Author(s): Craig Langston | Rick Best
Volume: 9
Issue: 1
Year: 2012
The Inherent Building Energy-Cost Relationship: An Analysis of Thirty Melbourne Case Studies

Author(s): Yu Lay Langston | Craig Langston
Volume: 9
Issue: 1
Year: 2012
Builders' Perceptions of Lowest Cost Procurement and Its Impact on Quality

Author(s): Mary Hardie | Swapan Saha
Volume: 9
Issue: 1
Year: 2012
Locational Factors and Foreign Market-entry Considerations for Malaysian Contractors

Author(s): A.R Abdul_Aziz
Volume: 9
Issue: 1
Year: 2012
Evaluating Truck Empty Running in Construction: A Case Study from Cape Town, South Africa

Author(s): Winston Shakantu | Mundia Muya | John Tookey | Paul Bown
Volume: 8
Issue: 2
Year: 2012
Individual Learning in Construction Projects: Professions and their Approaches

Author(s): Ingeborg Wasif | Per-Erik Josephson | Alexander Styhre
Volume: 8
Issue: 2
Year: 2012
Costs and Benefits of ISO9000-based Quality Management Systems to Construction Contractors

Author(s): Thomas Ng | Ekambaram Palaneeswaran | Mohan Kumaraswamy
Volume: 8
Issue: 2
Year: 2012
Editorial

Author(s): David Baccarini | Peter Davis
Volume: 8
Issue: 2
Year: 2012
Customisation and Desirable Characteristics of a Standard Method of Measurement for Building Works in Ghana

Author(s): Gabriel Nani | Peter Edwards | Theophilus Adjei-Kumi | Edward Badu | Peter Amoah
Volume: 8
Issue: 2
Year: 2012
Payment Mechanisms for Integrated Teams in Construction

Author(s): Ibrahim Motawa | Ammar Kaka
Volume: 8
Issue: 2
Year: 2012
Adapting Building Design to Access by Individuals with Intellectual Disability

Author(s): L Castell
Volume: 8
Issue: 1
Year: 2012
Comparing Contractors' Decision to Bid in Different Market Environments

Author(s): Bee-Lan Oo | Derek Drew | Hing-Po Lo
Volume: 8
Issue: 1
Year: 2012
Editorial

Author(s): David Baccarini | Peter Davis
Volume: 8
Issue: 1
Year: 2012
Risk Pricing in Construction Tenders - How, Who, What

Author(s): Marcus Tower | David Baccarini
Volume: 8
Issue: 1
Year: 2012
Risk Pricing in Construction Tenders - How, Who, What

Author(s): Marcus Towner | David Baccarini
Volume: 7
Issue: 2
Year: 2012
The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects

Author(s): Mary Hardie | Shahed Khan | Angela O'Donnell | Graham Miller
Volume: 7
Issue: 2
Year: 2012
Cooperation in the Building Sector between Building Material Manufacturers and Contractors to Develop Products

Author(s): Jan Sundqvist | Bengt Larsson | Goran Lindahl
Volume: 7
Issue: 2
Year: 2012
A Preliminary Study on Human Resources Management in International Construction

Author(s): Jianjian Du | Chunlu Liu | David Picken
Volume: 7
Issue: 2
Year: 2012
Editorial

Author(s): David Baccarini | Peter Davis
Volume: 7
Issue: 2
Year: 2012
Maintaining Relationship Based Procurement

Author(s): Peter Davis
Volume: 7
Issue: 2
Year: 2012
Building Energy and Cost Performance: An Analysis of Thirty Melbourne Case Studies

Author(s): Yu Lay Langston | Craig Langston
Volume: 7
Issue: 1
Year: 2012
Editorial

Author(s): David Baccarini | Pater Davis
Volume: 7
Issue: 1
Year: 2012
The Significance of Barriers to Entry in the Construction Industry

Author(s): Gerard de Valence
Volume: 7
Issue: 1
Year: 2012
Modeling the Design Team as a Temporary Management Structure: Reality versus Theory

Author(s): Kathy Michell | Paul Bowen | Keith Cattell
Volume: 7
Issue: 1
Year: 2012
The Effects of Occupational Licensing on Skills Needs in the Building Industry: Evidence from New Zealand

Author(s): Yadeeb Lobo | Suzanne Wilkinson
Volume: 6
Issue: 2
Year: 2012
Achieving Supply Chain Integration within Construction Industry

Author(s): Peter McDermotti | Malik Khalfan
Volume: 6
Issue: 2
Year: 2012
Construction Tender Subcontract Selection using Case-based Reasoning

Author(s): Due Luu | Wily Sher
Volume: 6
Issue: 2
Year: 2012
Editorial

Author(s): George Zillante
Volume: 6
Issue: 2
Year: 2012
Formulation of Generic Simulation Models for Analyzing Construction Claims

Author(s): Rifat Rustom
Volume: 6
Issue: 2
Year: 2012
Relationship Contracting: The South Australian Experience - A Case Study

Author(s): Jian Zou | George Zillante
Volume: 6
Issue: 2
Year: 2012
Traditional Procurement is too Slow

Author(s): Ann Kong | Jason Gray
Volume: 6
Issue: 1
Year: 2012
Editorial

Author(s): George Zillante
Volume: 6
Issue: 1
Year: 2012
Project Finance Model for Small Contractors in USA

Author(s): Jawahar Nesan
Volume: 6
Issue: 1
Year: 2012
RPA Switzerland

Robotic Process Automation Switzerland

    

Tango Jona
Tangokurs Rapperswil-Jona