Explaining the Evolution of Performance Measures - A Dual Case-Study Approach

Author(s): Mohammed Salloum
Volume: 3
Issue: 2
Year: 2013





The Financial Impact of Risk Factors Affecting Project Cost Contingency: Evidential Reasoning Method

Author(s): Joseph Ignatius Teye Buertey | Emmanuel Abeere-Inga | Theophilus Adjei Kumi
Volume: 3
Issue: 2
Year: 2013





The Assessment of Biofuel Utilization Policy on the Total Output and CO2 Emissions in Thailand

Author(s): Suthathip Suanmali | Bundit Limmeechokchai
Volume: 3
Issue: 2
Year: 2013





A Framework for Improving Project Performance of Standard Design Models in Saudi Arabia

Author(s): Shabbab Al-Otaib | Mohamed Osman | Andrew D.F. Price
Volume: 3
Issue: 2
Year: 2013





Engineering, Project, and Production Management: Optimizing Performance in Risky Economic Environments

Author(s): Joanicjusz Nazarko
Volume: 3
Issue: 2
Year: 2013





Determining the Performance of Procurement Methods against Selection Criteria using Outranking - Satisfying Methodology

Author(s): OJO Stephen Okunlola | IKPO Imeh Johnson
Volume: 3
Issue: 2
Year: 2013





Engineering, Project, and Production Management: Lessons

Author(s): Kassim Gidado
Volume: 3
Issue: 1
Year: 2013





Developing A Strategy to Enact Lean

Author(s): Nicola Morrey | Christine Pasquire | Andrew Dainty
Volume: 3
Issue: 1
Year: 2013





Theft and Vandalism Control Measures on Building Sites in Lagos, Nigeria

Author(s): Oluranti Farinloye | Kole Odusami | Yewande Adewunmi
Volume: 3
Issue: 1
Year: 2013





Integrating Fuzzy Delphi with Fuzzy Analytic Hierarchy Process for Multiple Criteria Inventory Classification

Author(s): Golam Kabir | Sultana Sumi
Volume: 3
Issue: 1
Year: 2013





Structural Insulated Panels: Past, Present, and Future

Author(s): Mohammad Panjehpour | Abang Abdullah Abang Ali | Yen Lei Voo
Volume: 3
Issue: 1
Year: 2013





Production Cells in Construction: Considering Time, Space and Information Linkages to Seek Broader Implementations

Author(s): Renato Nunes Mariz | Flavio Augusto Picchi | Ariovaldo Denis Granja | Reymard Sávio Sampaio de Melo
Volume: 3
Issue: 1
Year: 2013





Production Resource Management in the Industrialised House-Building Supply Chain

Author(s): Martin Lennartsson | Anders Björnfot
Volume: 2
Issue: 2
Year: 2012





Project and Production Management in the Construction Industry

Author(s): Chien-Ho Ko
Volume: 2
Issue: 2
Year: 2012





Evaluating Production Time Buffer for Precast Fabrication

Author(s): Chien-Ho Ko | Yu-Chun Chen
Volume: 2
Issue: 2
Year: 2012





The Last Planner System Style of Planning: Its Basis in Learning Theory

Author(s): Bo Terje Kalsaas
Volume: 2
Issue: 2
Year: 2012





Determination of Optimum Frame Rates for Observation of Construction Operations from Time-Lapse Movies

Author(s): Y. M. Ibrahim | A. D. Ibrahim | P. G. Chindo
Volume: 2
Issue: 2
Year: 2012





Analysis of Conflict Centers in Projects Procured with Traditional and Integrated Methods in Nigeria

Author(s): Martin O. Dada
Volume: 2
Issue: 2
Year: 2012





Evaluating the Impact of Risk on Contractor’s Tender Figure in Public Buildings Projects in Northern Nigeria

Author(s): L. O. Oyewobi | A. D. Ibrahim | B. O. Ganiyu
Volume: 2
Issue: 1
Year: 2012





Potential Use of Communications and Project Management Systems in Remote Construction Projects: The Case of Saudi Electric Company

Author(s): Bhzad Sidawi
Volume: 2
Issue: 1
Year: 2012





Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual Study

Author(s): Benedict D. Ilozor | David J. Kelly
Volume: 2
Issue: 1
Year: 2012





Extent and Effect of Horizontal Supply Chain Collaboration among Construction SME

Author(s): Anders Björnfot | Liv Torjussen
Volume: 2
Issue: 1
Year: 2012





Sandcrete Blocks and Quality Management in Nigeria Building Industry

Author(s): M. N. Anosike | A. A. Oyebade
Volume: 2
Issue: 1
Year: 2012





Multidisplinary Engineering, Project, and Production Management

Author(s): Chien-Ho Ko
Volume: 2
Issue: 1
Year: 2012





Risk Classification Model for Design and Build Projects

Author(s): O. E. Ogunsanmi | O. A. Salako | O. M. Ajayi
Volume: 1
Issue: 1
Year: 2011





A Simulation Model for Spatial Scheduling of Dynamic Block Assembly in Shipbuilding

Author(s): Zhuo Liu | David K. H. Chua | Keng Hwee Wee
Volume: 1
Issue: 1
Year: 2011





Cost-Benefit Analysis of High-Speed Rail Link between Hong Kong and Mainland China

Author(s): R. Tao | S. Liu | C. Huang | C. M. Tam
Volume: 1
Issue: 1
Year: 2011





Evaluation of Structural Behavior of Externally Prestressed Segmented Bridge with Shear Key under Torsion

Author(s): M. A. Algorafi | A. A. A. Ali | I. Othman | M. S. Jaafar | R. A. Almansob
Volume: 1
Issue: 1
Year: 2011





Integration of Engineering, Project, and Production Management

Author(s): Chien-Ho Ko
Volume: 1
Issue: 1
Year: 2011





Improving Formwork Engineering Using the Toyota Way

Author(s): Chien-Ho Ko | Wei-Chieh Wang | Jiun-De Kuo
Volume: 1
Issue: 1
Year: 2011




